Floors are the biggest surface in the building and the first to look tired
VCT, tile, luxury vinyl, concrete and carpet, each on its own cycle, scheduled around your calendar rather than done in a panic.
- Licensed and insured
- Five star rated
- Background checked crews
- Commercial only, five years
Floors carry more visual weight than anything else in a commercial space, simply because there is so much of them. They are also the surface most likely to be maintained reactively: everything looks acceptable, then one morning it does not, and by then the finish is worn through and the fix is expensive.
New England makes this worse than most places. Six months of salt, sand and slush come in on every shoe from November onward, and salt is abrasive as well as ugly. A floor plan that ignores winter is a floor plan that resurfaces every three years instead of every seven.

What the visit covers
- VCT stripped and refinished with the coat count your traffic needs
- Hard floors scrubbed and burnished on a set cycle
- Luxury vinyl and laminate cleaned with the right pH, never flooded
- Ceramic and porcelain tile deep scrubbed, grout lines worked
- Concrete cleaned and sealed where the surface calls for it
- Carpet vacuumed properly, edges and under furniture included
- Hot water extraction for carpet and commercial upholstery
- Spot and stain treatment between full extractions
- Entrance matting cleaned and lifted, floor under it treated
- Winter salt removal program from November through March
Why we schedule floors instead of reacting to them
A finish that is burnished on a cycle keeps a wear layer between the traffic and the tile. Once that layer is gone the tile itself takes the damage, and no amount of buffing brings it back. The difference between planned and reactive is measured in thousands of dollars of replacement.
So floor work goes on your calendar at the start, with dates that avoid your busy weeks. Most offices run extraction twice a year and a burnish quarterly. Clinics and schools run tighter. Warehouses depend entirely on the traffic and the forklift tyres.
About floor care
If what you need to know is not here, call and ask. We would rather tell you we are the wrong fit than sell you a program you do not need.
How long does the floor need to stay off?
A scrub and recoat is normally walkable the next morning. A full strip and wax needs the area closed longer, which is why it gets scheduled for a Friday night or a holiday weekend rather than a Tuesday.
Can you work around our furniture?
Yes. Most jobs are done in sections so the space stays usable, and we agree what moves and what stays before the date. Anything heavy or fragile is your call.
Is carpet extraction included in a janitorial contract?
It is quoted separately because it is a different job with different equipment, but it is planned into your yearly schedule so it never arrives as a surprise cost.
Get floor care quoted in writing.
Free walkthrough, one flat price, and a scope you can hold us to from the first visit.
